Mitel 50005070 Instruction Manual Page 262

  • Download
  • Add to my manuals
  • Print
  • Page
    / 416
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 261
252
SX-200 ICP MX Technician’s Handbook
Test/Verify (Loop Start)
Verify far-end (CO) circuits by using a standard telephone set in place
of the Loop Start trunk circuit.
Verify near-end (PBX Loop Start) circuits by connecting to a local PBX
ONS circuit.
Check for appropriate voltages on Tip-Ring in each call state.
During off-hook condition, 18 mA DC minimum should be drawn from
the CO (typical 25-40 mA).
Some Key/PBX systems may be polarity sensitive; reverse Tip-Ring to
verify.
Table 51: Loop Start Line/Trunk Summary
Signal
Loop Start Line PBX
Outgoing
Loop Start Line PBX
Incoming
Seize Tip-Ring leads activated
(shorted); Loop Current flows
in line
90Vac is applied to Ring
lead in 2 sec on, 4 sec
off cadence
Seize
Acknowledgment
Loop Current and/or dial tone
generated
Digits Loop Current toggled (Rotary)
or DTMF
Stop Dial
Receipt of Digits Audible Tones - Busy,
Reorder, Ringback dependent
upon digits dialed and called
party condition
Answer Supervision Some COs can reverse
current flow
Tip-Ring leads activated
(shorted); Loop Current
flows in line
Disconnect
Supervision
Near- end termination: PBX/
Telephone can break Loop
Current
Near- end termination:
PBX/Telephone can
break Loop Current
Page view 261
1 2 ... 257 258 259 260 261 262 263 264 265 266 267 ... 415 416

Comments to this Manuals

No comments